1.2M Android Apps Tracked Updated 3 min ago Revenue Forecasts
Add an app Create Account Sign In
Home

MyTime Scheduler for Merchants

45
Quality Score
Emerging

MyTime Scheduler for Merchants

Medium confidence
3.3 ✍️ Editor
✍️ bumetric analysis

MyTime Scheduler for Merchants is an Android app from Melian Labs Inc in the Business category, currently rated 3.3★ across 270 ratings. Initial signal reads as mixed reviews: supporters praise core features while critics cite stability and value gaps.

Quality Score is 45: Emerging (early traction worth watching). For a Business app, that means early traction worth watching. The full BU Investment Matrix below scores 8 dimensions including monetisation, growth, and operational risk.

Track changes month-over-month in the Performance section below: live snapshot history and revenue forecast included.

💰 Monthly revenue · now vs forecast
● Right now
$500
per month
12-mo forecast
$437 – $1575
per month
24-mo forecast
$405 – $3644
per month
INDIE tier
💡 Grow this revenue
Free AI audit of this app’s store listing
  • Title & subtitle keyword fit
  • Description hook & conversion structure
  • Screenshots, ratings, reviews strategy
Run free AI audit →
Typical impact: +2-5× organic installs
🔔Notify me when this app's revenue changes by

📊 Performance Tracking LIVE

Loading…
idle
0%
Rating
Reviews
Forecast Revenue / mo
Snapshots tracked
0
since first record
ONE-TIME · BUILD 💰 Estimated build cost
$115K
What it cost to build · not monthly revenue
Likely range $85K – $155K
$25K · MVP floor $100K · indie scale $500K+ · studio build
📈 Slow ROI — current MRR is well below build cost

Synthetic estimate. Inputs: category complexity, file size, screen count, monetization layer, platform reach, age × team-size proxy. Calibrated against 2024-2026 indie-agency rate surveys. Full math + source list on /methodology.

Where the money goes
🧱 MVP baseline (design + 1-store ship) +$28K
📱 5 unique screens × $4.5K +$22K
Business complexity ×1.50 +$25K
🌐 Cross-platform reach (iOS + Android) +$41K
Total estimate $115K
👥 Estimated audience size
17K
Lifetime downloads (US-equivalent)
Monthly active
3.8K
Daily active
1.1K

Synthetic estimate from ratings × category benchmarks. Calibrated against 2024-2026 mobile-attribution retention + DAU/MAU reports. Numbers are US-storefront-equivalent — true global audience can be 5-10× larger for international apps. Full math + source list on /methodology.

How we sized it
📲 Business engagement ~65 installs / rating
🔁 Business D30 retention 22%
📍 DAU / MAU stickiness 0.30
DAU / MAU 29% sticky
🔬

How we forecast this revenue

LOW CONFIDENCE
Baseline
$500/mo · ML-estimated from 234 triggers
Growth rate
+6.0% MoM · INDIE tier baseline (compound monthly)
6 months
$426 – $993
12 months
$437 – $1.6K
24 months
$405 – $3.6K
Compound growth at +6.0% MoM (tier baseline for INDIE). Range widens with horizon — typical noise band ±40% at 6mo.. Ranges widen with horizon — distant futures carry more uncertainty.
📊

BU Investment Matrix

Pre-traction · 36/100INDIE TIERlimited signal
RevenueQualityMarketGrowthMoatSafetyFounderMonetiz.
Revenue Strength
2.7
Product Quality
4.6
Market Position
0.0
Growth Velocity
5.0
Defensibility
4.5
Operational Safety
8.0
Founder Strength
3.3
Monetization Maturity
1.0
  • 💰 Revenue: Marginal — $200 - $1250/mo · INDIE tier · medium confidence, trajectory unclear.
  • ⭐ Quality: 3.29★ across 270 reviews — below category median.
  • 📍 Market: Not yet charting in any of the 9 monitored markets.
  • 📈 Growth: Insufficient signal to assess trajectory.
  • ⚠️ Risk: Moderate — no material risk signals detected.
🎯 For competitors: Mixed picture. Worth competing if you have a clear UX or pricing edge — otherwise crowded segment.
💵 For acquirers: Estimated asking range 18-32× monthly = $9K-$16K.
Composite of 8 dimensions computed deterministically from public signals — no LLM, every score traces back to a measurable input. Default weights shown; "compete" / "acquire" / "invest" lenses re-weight without re-fetching.
Range:

💰 Forecast Revenue / mo

MODEL
Revenue forecast computed from BU's 234 trigger model on each snapshot. Calibrated against ground-truth from 58 verified-revenue apps.
🔬Forecast Breakdown — Why This Estimate?Top 4 of 4 triggers
Our ML model uses 200+ signals from public data. These are the most influential for this app:
Below-average rating (3.3★)METRIC
−$1,500
Mature app (11y old)METRIC
+$1,500
Ad-supported / freemiumMETRIC
+$600
Early-stage install base (270 ratings)METRIC
+$400
METRIC = structural app data · REVIEW = mined from user reviews · ✓ VERIFIED = Stripe-verified anchor (TrustMRR)

📈 Reviews Growth

LIVE
Cumulative review count from first BU snapshot. Each point = a tracked update.

⭐ Rating Trend

LIVE
Average rating evolution. Updates with each new review batch.

Profile & Insights

Everything we know — and don't — about this app and its company.

Identification

App name
MyTime Scheduler for Merchants
Developer
Melian Labs Inc
Bundle ID
com.melianlabs.mytimescheduler
App Store URL
Open in App Store
Category
Business
Content rating
Not found
Languages
Not found

Company

Website
www.mytime.com
Tagline
Not found
Description
Not found
Founded
Not found
HQ / Address
Not found
Employees
Not found
Logo
Not found

Revenue

Verified revenue / mo
Not found
AI revenue estimate / mo
Not found
AI annual estimate
Not found
ML model estimate / mo
$219/mo
Top-grossing rank
Not found
All-time revenue
Not found
Pricing
Not found

Founder

Founder data not yet collected for this app.

Funding

Funding data not yet collected for this app.

Press & Links

Press & Links data not yet collected for this app.

Contacts & Socials

Contacts & Socials data not yet collected for this app.
📈Ratings growth270 ratings+22% lifetimeShow 3-year history estimate ▾Jun 2023Jan 2025Jun 2026
Tracked (1 weeks) Pre-tracking estimate (37 weeks) · model-based, ±5% noise · anchored to release date and current value
Profile is built from iTunes Lookup + developer site scrape + ML revenue model. Empty fields show "Not found" — additional sources (Crunchbase, X, IndieHackers, Acquire.com) coming.

📝 About this app

<font color="#319FB5"><b>ABOUT MYTIME SCHEDULER</b></font>

MyTime Scheduler is seven products in one, available right from your Android device!

• Online scheduling and appointment calendar
• Client Relationship Manager (CRM)
• Point of Sale and Inventory Management (POS)
• Instant Messenger (IM)
• Business Intelligence and Analytics (BI)
• Automated Marketing (Email and SMS)
• Web Presence Tool (Listing and Reputation Management)… View full description on the official store →
App Specs
🔐 Own this app? Claim & verify MRR →
🔖 v18.10.0🔄 updated 0d ago📂 Business💰 Free
🔔

Track this app’s revenue

FREE
Get an email when revenue moves by your threshold. No spam, unsubscribe in one click.

📝 Description

95
BU Score · Transcendent
Full revenue analysis
Read the article-style breakdown for MyTime Scheduler for Merchants: category rank, percentile, growth signal, comparable apps, and how the forecast is calibrated against verified-MRR anchors in this niche.
Read deep-dive →

Similar apps in Business

About this analysis
ZCAnalyzed by Zakhar Chumak · founder, bumetric·Full methodology·Medium confidence

Why medium confidence: 270 ratings · no founder-verified revenue (model estimate only).

Frequently Asked Questions

4 answers · auto-generated from this app's public data
How much does MyTime Scheduler for Merchants make per month?
Based on our ML-calibrated revenue forecast, MyTime Scheduler for Merchants earns approximately $219/mo. This is a US-storefront-equivalent estimate; global revenue can be several times larger for internationally-distributed apps. See the methodology page for the full formula and confidence bands.
What apps are like MyTime Scheduler for Merchants?
Browse the full Business category catalog to find similar apps with revenue, build cost, audience and tech stack data. Each /p/{slug} page also shows a Compare side-by-side widget with three peer apps from the same niche.
Who makes MyTime Scheduler for Merchants?
MyTime Scheduler for Merchants is published by Melian Labs Inc on the Google Play Store. See the full publisher portfolio (other apps by the same developer) via the More by developer block on the product page above.
What is MyTime Scheduler for Merchants's BU Score?
MyTime Scheduler for Merchants has a BU Score of 45/100 (Emerging). The score combines App Store rating, ratings count, monetization model and revenue signals calibrated against founder-verified MRR anchors. See the BU Score formula.