1.2M Android Apps Tracked Updated 1 min ago Revenue Forecasts
Add an app Create Account Sign In
Home
🚫
Removed from Google Play Store
This app is no longer available for download. Historical metadata preserved for reference.

Farm Animals: learn farm animals and their food

41
Quality Score
Emerging

Farm Animals: learn farm animals and their food

3.7 ✍️ Editor
✍️ bumetric analysis

Farm Animals: learn farm animals and their food is an Android app from Next Dreams Project in the Educational category, currently rated 3.7★ across 7 ratings. Initial signal reads as no scraped reviews yet: judgment based on metadata only.

Quality Score is 41: Emerging (early traction worth watching). For a Educational app, that means early traction worth watching. The full BU Investment Matrix below scores 8 dimensions including monetisation, growth, and operational risk.

Track changes month-over-month in the Performance section below: live snapshot history and revenue forecast included.

💰 Monthly revenue · now vs forecast
● Right now
$104
per month
12-mo forecast
$52 – $486
per month
24-mo forecast
$52 – $1458
per month
MICRO tier
💡 Grow this revenue
Free AI audit of this app’s store listing
  • Title & subtitle keyword fit
  • Description hook & conversion structure
  • Screenshots, ratings, reviews strategy
Run free AI audit →
Typical impact: +2-5× organic installs
🔔Notify me when this app's revenue changes by

📊 Performance Tracking LIVE

Loading…
idle
0%
Rating
Reviews
Forecast Revenue / mo
Snapshots tracked
0
since first record
ONE-TIME · BUILD 💰 Estimated build cost
$95K
What it cost to build · not monthly revenue
Likely range $70K – $130K
$25K · MVP floor $100K · indie scale $500K+ · studio build
📈 Slow ROI — current MRR is well below build cost

Synthetic estimate. Inputs: category complexity, file size, screen count, monetization layer, platform reach, age × team-size proxy. Calibrated against 2024-2026 indie-agency rate surveys. Full math + source list on /methodology.

Where the money goes
🧱 MVP baseline (design + 1-store ship) +$28K
📱 5 unique screens × $4.5K +$22K
Educational complexity ×1.20 +$10K
🌐 Cross-platform reach (iOS + Android) +$33K
Total estimate $95K
🛠 Estimated tech stack
🤖
Native Android (Kotlin)
High confidence · 80%
Also possible
Flutter

Heuristic guess from app bundle size, category, store description signals, and release-date stack era. Bumetric does not disassemble binaries — for binary-level certainty you would need an SDK intelligence tool or the manifest itself. Reasoning chain on the right. Full ruleset on /methodology.

Signals we read
🏷 Category context Educational
📦 Compact Android bundle → Native Kotlin
🔬

How we forecast this revenue

LOW CONFIDENCE
Baseline
$104/mo · ML-estimated from 234 triggers
Growth rate
+8.0% MoM · MICRO tier baseline (compound monthly)
Direction
Headwinds: rating drift may slow acquisition
6 months
$66 – $265
12 months
$52 – $486
24 months
$52 – $1.5K
Compound growth at +8.0% MoM (tier baseline for MICRO). Range widens with horizon — typical noise band ±60% at 6mo.. Ranges widen with horizon — distant futures carry more uncertainty.
📊

BU Investment Matrix

Insufficient data · 35/100MICRO TIERtoo early to score
RevenueQualityMarketGrowthMoatSafetyFounderMonetiz.
Revenue Strength
2.0
Product Quality
3.0
Market Position
0.0
Growth Velocity
5.0
Defensibility
3.5
Operational Safety
10.0
Founder Strength
3.4
Monetization Maturity
1.0
  • 💰 Revenue: Marginal — $0 - $500/mo · MICRO tier · indicative confidence, trajectory unclear.
  • ⭐ Quality: 3.7★ across 7 reviews — weak — significant quality concerns.
  • 📍 Market: Not yet charting in any of the 9 monitored markets.
  • 📈 Growth: Insufficient signal to assess trajectory.
  • ⚠️ Risk: Low — no material risk signals detected.
🎯 For competitors: Mixed picture. Worth competing if you have a clear UX or pricing edge — otherwise crowded segment.
💵 For acquirers: Estimated asking range 18-32× monthly = $1K-$3K. Portfolio play ($243/mo combined) commands premium.
Composite of 8 dimensions computed deterministically from public signals — no LLM, every score traces back to a measurable input. Default weights shown; "compete" / "acquire" / "invest" lenses re-weight without re-fetching.
Range:

💰 Forecast Revenue / mo

MODEL
Revenue forecast computed from BU's 234 trigger model on each snapshot. Calibrated against ground-truth from 58 verified-revenue apps.

📈 Reviews Growth

LIVE
Cumulative review count from first BU snapshot. Each point = a tracked update.

⭐ Rating Trend

LIVE
Average rating evolution. Updates with each new review batch.

Profile & Insights

Everything we know — and don't — about this app and its company.

Identification

App name
Farm Animals: learn farm animals and their food
Developer
Next Dreams Project
Bundle ID
com.nextdreamsproject.farmanimals
App Store URL
Open in App Store
Category
Educational
Content rating
Not found
Languages
Not found

Company

Website
Not found
Tagline
Not found
Description
Not found
Founded
Not found
HQ / Address
Not found
Employees
Not found
Logo
Not found

Revenue

Verified revenue / mo
Not found
AI revenue estimate / mo
Not found
AI annual estimate
Not found
ML model estimate / mo
$105/mo
Top-grossing rank
Not found
All-time revenue
Not found
Pricing
Not found

Founder

Founder data not yet collected for this app.

Funding

Funding data not yet collected for this app.

Press & Links

Press & Links data not yet collected for this app.

Contacts & Socials

Contacts & Socials data not yet collected for this app.
Profile is built from iTunes Lookup + developer site scrape + ML revenue model. Empty fields show "Not found" — additional sources (Crunchbase, X, IndieHackers, Acquire.com) coming.
App Specs
🔐 Own this app? Claim & verify MRR →
📂 Educational💰 Free
🔔

Track this app’s revenue

FREE
Get an email when revenue moves by your threshold. No spam, unsubscribe in one click.

📝 Description

95
BU Score · Transcendent

More by Next Dreams Project

View all →
📦 Portfolio summaryINDIE studio
2apps·$243/mocombined
Lead-app heavy — top app contributes 57%

Similar apps in Educational

About this analysis
ZCAnalyzed by Zakhar Chumak · founder, bumetric·Full methodology·Low confidence

Why low confidence: only 7 ratings · no founder-verified revenue (model estimate only) · revenue figure is directional only.

📌 Final verdict — read this before you trust the numbers above

Farm Animals: learn farm animals and their food is a early-stage Android app in the educational space with weak public traction — only 7 ratings, no founder-verified MRR, and not ranked in any monitored grossing chart. The app appears to be monetised, but public signals are too sparse for a precise revenue estimate.

Bottom line: treat all revenue, audience and acquisition-value numbers on this page as directional only — not founder-verified facts.

Frequently Asked Questions

4 answers · auto-generated from this app's public data
How much does Farm Animals make per month?
Low-confidence model estimate. Farm Animals has only 7 App Store ratings, so our revenue model has very little signal to work with — treat the ~$104/mo figure as directional only, not a verified MRR. No founder-verified revenue data is available for this app. See methodology for the formula and confidence bands.
What apps are like Farm Animals?
Browse the full Educational category catalog to find similar apps with revenue, build cost, audience and tech stack data. Each /p/{slug} page also shows a Compare side-by-side widget with three peer apps from the same niche.
Who makes Farm Animals?
Farm Animals is published by Next Dreams Project on the Google Play Store. See the full publisher portfolio (other apps by the same developer) via the More by developer block on the product page above.
What is Farm Animals's BU Score?
Farm Animals has a BU Score of 41/100 (Emerging). The score combines App Store rating, ratings count, monetization model and revenue signals calibrated against founder-verified MRR anchors. See the BU Score formula.