1.3M Android Apps Tracked Updated 1 min ago Revenue Forecasts
Add an app Create Account Sign In
Home

VR - MTB Downhill bicycle raci

45
Quality Score
Emerging

VR - MTB Downhill bicycle raci

Medium confidence
3.2 ✍️ Editor
✍️ bumetric analysis

VR - MTB Downhill bicycle raci is an Android app from iGames Entertainment in the Simulation category, currently rated 3.2★ across 516 ratings. Initial signal reads as largely positive sentiment, users highlighting consistency and feature depth.

Quality Score is 45: Emerging (early traction worth watching). For a Simulation app, that means early traction worth watching. The full BU Investment Matrix below scores 8 dimensions including monetisation, growth, and operational risk.

Track changes month-over-month in the Performance section below: live snapshot history and revenue forecast included.

💰 Monthly revenue · now vs forecast
● Right now
$5.0K
per month
12-mo forecast
$5.2K – $10.8K
per month
24-mo forecast
$6.4K – $19.2K
per month
MID tier
💡 Grow this revenue
Free AI audit of this app’s store listing
  • Title & subtitle keyword fit
  • Description hook & conversion structure
  • Screenshots, ratings, reviews strategy
Run free AI audit →
Typical impact: +2-5× organic installs
🔔Notify me when this app's revenue changes by

📊 Performance Tracking LIVE

Loading…
idle
0%
Rating
Reviews
Forecast Revenue / mo
Snapshots tracked
0
since first record
ONE-TIME · BUILD 💰 Estimated build cost
$155K
What it cost to build · not monthly revenue
Likely range $115K – $210K
$25K · MVP floor $100K · indie scale $500K+ · studio build
📈 Slow ROI — current MRR is well below build cost

Synthetic estimate. Inputs: category complexity, file size, screen count, monetization layer, platform reach, age × team-size proxy. Calibrated against 2024-2026 indie-agency rate surveys. Full math + source list on /methodology.

Where the money goes
🧱 MVP baseline (design + 1-store ship) +$28K
📱 5 unique screens × $4.5K +$22K
Simulation complexity ×2.00 +$50K
🌐 Cross-platform reach (iOS + Android) +$55K
Total estimate $155K
👥 Estimated audience size
72K
Lifetime downloads (US-equivalent)
Monthly active
10K
Daily active
3.1K

Synthetic estimate from ratings × category benchmarks. Calibrated against 2024-2026 mobile-attribution retention + DAU/MAU reports. Numbers are US-storefront-equivalent — true global audience can be 5-10× larger for international apps. Full math + source list on /methodology.

How we sized it
📲 Simulation engagement ~140 installs / rating
🔁 Simulation D30 retention 15%
📍 DAU / MAU stickiness 0.30
DAU / MAU 30% sticky
🛠 Estimated tech stack
🤖
Native Android (Kotlin)
Medium confidence · 55%
Also possible
Flutter

Heuristic guess from app bundle size, category, store description signals, and release-date stack era. Bumetric does not disassemble binaries — for binary-level certainty you would need an SDK intelligence tool or the manifest itself. Reasoning chain on the right. Full ruleset on /methodology.

Signals we read
🏷 Category context Simulation
📦 Tiny game bundle → Native 2D engine
🔬

How we forecast this revenue

MEDIUM CONFIDENCE
Baseline
$5.0K/mo · ML-estimated from 234 triggers
Growth rate
+4.0% MoM · MID tier baseline (compound monthly)
6 months
$4.7K – $7.9K
12 months
$5.2K – $10.8K
24 months
$6.4K – $19.2K
Compound growth at +4.0% MoM (tier baseline for MID). Range widens with horizon — typical noise band ±25% at 6mo.. Ranges widen with horizon — distant futures carry more uncertainty.
📊

BU Investment Matrix

Stalled · 39/100MID TIERno growth momentum
GrowthFounderQualityRevenueMonetiz.MoatMarketSafety
Growth Velocity
5.0
Founder Strength
5.3
Product Quality
4.4
Revenue Strength
3.7
Monetization Maturity
1.0
Defensibility
7.2
Market Position
0.0
Operational Safety
5.0
  • 💰 Revenue: Modest — $3K - $7K/mo · MID tier · medium confidence, trajectory unclear.
  • ⭐ Quality: 3.17★ across 516 reviews — weak — significant quality concerns.
  • 📍 Market: Not yet charting in any of the 9 monitored markets.
  • 📈 Growth: ⚠ last update 3139d ago — possibly dormant.
  • ⚠️ Risk: Elevated — dormant (3139d since update).
🎯 For competitors: Vulnerable. Quality drift + slow updates create a clear opening for a fresh competitor with active dev cadence.
💵 For acquirers: Estimated asking range 18-32× monthly = $90K-$160K.
Composite of 8 dimensions computed deterministically from public signals — no LLM, every score traces back to a measurable input. Default weights shown; "compete" / "acquire" / "invest" lenses re-weight without re-fetching.
Range:

💰 Forecast Revenue / mo

MODEL
Revenue forecast computed from BU's 234 trigger model on each snapshot. Calibrated against ground-truth from 58 verified-revenue apps.
🔬Forecast Breakdown — Why This Estimate?Top 6 of 6 triggers
Our ML model uses 200+ signals from public data. These are the most influential for this app:
unique featuresREVIEW
+$1,600
Below-average rating (3.2★)METRIC
−$1,500
Mature app (8y old)METRIC
+$1,500
slowREVIEW
−$1,200
Ad-supported / freemiumMETRIC
+$600
Early-stage install base (516 ratings)METRIC
+$400
METRIC = structural app data · REVIEW = mined from user reviews · ✓ VERIFIED = Stripe-verified anchor (TrustMRR)

📈 Reviews Growth

LIVE
Cumulative review count from first BU snapshot. Each point = a tracked update.

⭐ Rating Trend

LIVE
Average rating evolution. Updates with each new review batch.

Profile & Insights

Everything we know — and don't — about this app and its company.

Identification

App name
VR - MTB Downhill bicycle raci
Developer
iGames Entertainment
Bundle ID
com.rvx.mtb.vr.bicycle.racing.simulator
App Store URL
Open in App Store
Category
Simulation
Content rating
Not found
Languages
Not found

Company

Website
therationalstudio.com
Tagline
Not found
Description
Not found
Founded
Not found
HQ / Address
Not found
Employees
Not found
Logo
Not found

Revenue

Verified revenue / mo
Not found
AI revenue estimate / mo
Not found
AI annual estimate
Not found
ML model estimate / mo
$138/mo
Top-grossing rank
Not found
All-time revenue
Not found
Pricing
Not found

Founder

Founder data not yet collected for this app.

Funding

Funding data not yet collected for this app.

Press & Links

Press & Links data not yet collected for this app.

Contacts & Socials

Contacts & Socials data not yet collected for this app.
📈Ratings growth516 ratings+24% lifetimeShow 3-year history estimate ▾Aug 2023Feb 2025Jul 2026
Tracked (1 weeks) Pre-tracking estimate (36 weeks) · model-based, ±5% noise · anchored to release date and current value
Profile is built from iTunes Lookup + developer site scrape + ML revenue model. Empty fields show "Not found" — additional sources (Crunchbase, X, IndieHackers, Acquire.com) coming.

📝 About this app

VR Bicycling is the lastest game to play in virtual reality mode, you must have tried normal bicycle racing simulator games, this vr (virtual reality) game gives normal and VR bike racing both. Get on the mtb bike and play in Virtual reality, the realistic VR experience of bike you always wanted. Ride this VR bicycle in downhill drive the adrenaline and thrill you will love in this VR game, Welcome in hills world with your mtb for some downhill thrill. Presenting this time the best piece of simulation MTB downhill game games.… View full description on the official store →
App Specs
🔐 Own this app? Claim & verify MRR →
🔖 v1.0🔄 updated 0d ago📂 Simulation💰 Free📺 Ad-supported
🔔

Track this app’s revenue

FREE
Get an email when revenue moves by your threshold. No spam, unsubscribe in one click.

📝 Description

95
BU Score · Transcendent
Full revenue analysis
Read the article-style breakdown for VR - MTB Downhill bicycle raci: category rank, percentile, growth signal, comparable apps, and how the forecast is calibrated against verified-MRR anchors in this niche.
Read deep-dive →

More by iGames Entertainment

View all →
📦 Portfolio summaryINDIE studio
10apps·$637/mocombined
✓ Diversified — top app contributes 22%; risk spread across portfolio

Similar apps in Simulation

About this analysis
ZCAnalyzed by Zakhar Chumak · founder, bumetric·Full methodology·Medium confidence

Why medium confidence: 516 ratings · no founder-verified revenue (model estimate only).

Frequently Asked Questions

4 answers · auto-generated from this app's public data
How much does VR - MTB Downhill bicycle raci make per month?
Based on our ML-calibrated revenue forecast, VR - MTB Downhill bicycle raci earns approximately $355/mo. This is a US-storefront-equivalent estimate; global revenue can be several times larger for internationally-distributed apps. See the methodology page for the full formula and confidence bands.
What apps are like VR - MTB Downhill bicycle raci?
Browse the full Simulation category catalog to find similar apps with revenue, build cost, audience and tech stack data. Each /p/{slug} page also shows a Compare side-by-side widget with three peer apps from the same niche.
Who makes VR - MTB Downhill bicycle raci?
VR - MTB Downhill bicycle raci is published by iGames Entertainment on the Google Play Store. See the full publisher portfolio (other apps by the same developer) via the More by developer block on the product page above.
What is VR - MTB Downhill bicycle raci's BU Score?
VR - MTB Downhill bicycle raci has a BU Score of 45/100 (Emerging). The score combines App Store rating, ratings count, monetization model and revenue signals calibrated against founder-verified MRR anchors. See the BU Score formula.